LOS ANGELES—Starting on Sunday, the upper/departures and lower/arrivals levels of World Way will be closed at LAX’s Terminal 1 for varying times between 10 p.m. and 7 a.m. to facilitate construction of a pedestrian bridge over the roadway, airport officials announced.
The closures will be in effect until March 4 and again from March 6 through 9 for the bridge, which will connect the future Center Central Terminal Area Automated People Mover station to the extension of Terminal 1.